Village Creek Levee near Newport moves into permanent repair phase following emergency stabilization
Photo By Erin Jimenez | An aerial view of the Village Creek Levee near Newport, Arkansas, shows a section of...... read more read more
The U.S. Army Corps of Engineers is preparing to begin permanent repairs to the Village Creek Levee near Newport, Arkansas, later this fall following emergency stabilization work completed earlier this spring. The images document current conditions at the project site including aerial views of the levee, areas of remaining erosion and improvements made to an existing roadway to support access for repair operations. Permanent repairs will address remaining erosion and strengthen the levee to improve long-term reliability.
| Date Taken: | 07.17.2026 |
| Date Posted: | 07.17.2026 15:22 |
| Story ID: | 570219 |
| Location: | NEWPORT, ARKANSAS, US |
| Web Views: | 19 |
| Downloads: | 1 |
PUBLIC DOMAIN
This work, Village Creek Levee near Newport moves into permanent repair phase following emergency stabilization, by Erin Jimenez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.